Sunday, December 6, 2009

Almost done!

The van is almost together, the Westy interior is installed, exept for the fridge. The front seats, with seat heaters, are back in, new carpets in front, lino tiles in the back, radio installed, all windows have new rubber seals as well as all the doors. Rear windows are tinted, central locking, alarm installation, LED taillights and front turn signal lights. I am waiting for the new Yokohama Geolandar tires and the tire pressure monitoring system to come in that I will install at the same time. Still working on the front roof luggage rack that has the heat exchanger in it for the intercooler. Had the van outside today to let the engine warm up, watch the video.